Visitors only ever see the finished stand. But the hours before a show opens are where everything comes together, and they’re some of our favourite days of the year. Here’s what happens behind the scenes.
Before we arrive
Most of the work happens weeks earlier in our Redditch workshop, where the stand is built, finished and checked before it’s packed. Pieces are labelled, protected and loaded in the order they’ll be needed on site.
Our project manager confirms delivery slots, access routes, build times and health and safety paperwork with the organiser, and has a plan for every hour on site. It’s this preparation that makes build days run smoothly.
Day one: structure
- Marking out. We mark the stand footprint on the hall floor and check it against the plan and the neighbouring stands.
- Flooring. Raised floors go down first, with cabling routed underneath so it’s hidden on the finished stand.
- Structure. Walls, frames, counters and any store rooms or meeting rooms go up.
- Power. The organiser’s electrical contractor connects power to the points shown on our plan.
- Rigging. If there’s a hanging sign, it’s lifted by the venue’s approved riggers.
Day two: finishing
- Graphics. Wall graphics, lightboxes and vinyls are fitted and checked.
- Lighting. LED strips, spotlights and lit headers are installed and tested.
- AV. Screens are mounted and content checked on the actual displays.
- Furniture and details. Seating, plants, product displays and accessories go in.
- The final clean. Floors, glass and surfaces, so the stand looks perfect at opening.
Handover
We walk the stand with you, check everything works and fix anything that needs a tweak. It’s a good moment to take photos while the stand is pristine, and before the crowds arrive. Then we’re on call throughout the show in case anything needs attention.
Breakdown
When the show closes, the process runs in reverse. The stand is carefully dismantled, packed and either returned to us for storage or delivered back to you. Reusable stands are checked in the workshop so they’re ready for the next show.
Why it matters
A calm build comes from good planning. When the design, graphics and logistics are agreed in good time, build days run smoothly and you arrive to a stand that’s ready to go. Find out more about our stand installation service, or read what it’s like to work with us.